Location:HomeNewsCompany News

NEWS

(86)020-81326513

Won Multiple Projects Bids in Succession Edit Date:2022/12/16


       Recently, after winning bids for several lithium battery projects, GDE has achieved great results in the field of civil construction and whole-process cost consulting.


 Baiyun High-tech Zone • Intelligent Manufacturing Park Project


       The project is located in Guangzhou Rail Transit Equipment Industrial Park, Baiyun District, Guangzhou, with a planned land area of 39,396 m2, a total construction area of 132,193.89 m2, and a construction area of 125,916.86 m2. The project aims to build a comprehensive ecological smart industrial park dominated by intelligent equipment manufacturing and integrating production, research and development and office. GDE provides overall design services for the project, including planning and architectural design, landscape design, fine decoration of public areas, green buildings, sponge cities, intelligent design, foundation pit support design and floodlighting design, etc.

       Our technical team will deepen the implementation of the lean management requirements, based on traditional technical experience and customer needs as the starting point, uphold the “humanization, high adaptability, green low-carbon, digital, intelligent” design concept. GDE will use BIM design to improve design quality and efficiency, realizes design standardization, intelligence, ensures high-quality and efficient completion of projects, and creates high-quality projects with advanced technology.

 Whole-process Cost Consulting Management Service of Ningxiang Domestic Waste Incineration Power Generation Project

       The project is located in the Ningxiang domestic waste landfill, with a daily processing capacity of 1,000 tons of domestic waste. It is equipped with 2×500 tons/day mechanical grate incinerator and medium-temperature sub-high pressure heat recovery boiler + 1× 25MW condensing steam turbine generator set. The planned total storage capacity of the fly ash solidification landfill is 324,700 m³, and the total investment of the project is about 662.7 million yuan. GDE provides whole-process engineering cost consulting services and project management services for the project, and assists in planning, design, bidding, construction management consulting , etc.

       GDE makes full use of its experience in large-scale and complex projects and multi-disciplinary projects accumulated over the years, conforms to the development trend of the industry, and continuously innovates and integrates development in the field of whole-process consulting business. GDE has cultivated a full-process engineering consulting service project management team with high professionalism and strong working ability. We will uphold the “integrity-based, customer first” business philosophy, provide high-quality comprehensive, integrated whole-process engineering consulting services, and create greater value for customers.