Environment Protection
GDE has been engaged in engineering design of waste incineration project since 1992 and has gathered a wealth of experience in employing the technology of waste incineration to generate power. So far, GDE has already designed more than 200 waste-to-energy plants such rich experiences make us top-ranking in this field. In recent years, GDE keeps summing up the experience and searching for optimization and innovation in the technology of generating power from waste incineration.
Chaozhou City Chaoan District Waste Incineration Power Plant Project
                Chao Zhou City Chaoan District Waste Incineration Power Plant locates in Di Lingpu, Shaxi Town, Chaoan Distrct, Chaozhou City. Its daily capacity is 1200 ton domestic waste with 3x400t/d incinerators and 4.0MPa/400℃ exhaust heat boiler and installed capacity 2x15MW.This is a key project of environmental industry in Guangdong Province.
The detail engineering was started from June, 2015 and the plant was put in operation on 1st March, 2018.
Project Awards:
China 2019 Excellent Power Engineering Project, the greatest honor of power project;
First Prize of 2019 Excellent Engineering in Light Industry 
            
 
    Weifang Dongjiang Lanhai Environment Co., Ltd Industrial Solid Waste Reutilization Project
                The Project locates in Changyi City. It includes hazardous waste treatment facilities (capacity:60,000 t/a), materialization/effluent treatment facilities (capacity: 114,000 t/a), i.e. 174,000 t/a.
The design began in Oct, 2016 and the plant has been put into production in June, 2018.
Project Awards:
Second Prize of 2019 Excellent Engineering in Light Industry 
            
 
    Boluo County Domestic Waste Incineration Power Plant Project
                The project has daily capacity 1050t in two phases: 700 t/d for 1st and 350t/d for 2nd. Civil works has been finished in one time and in phase 2 only equipment installation. In 1st phase there are 2 of 350t/d incinerator, 1×12MW condensation turbine generator unit with 700t/d capacity, i.e annual 255,500t with occupied area 10 hectare and investment of CNY 420 million.  
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards. 
            
 
    Changsha City Domestic Waste Comprehensive Treatment (Clean Incineration) Project
                Changsha City Domestic Waste Comprehensive Treatment (Clean Incineration) Project locates in Wangcheng District, Changsha City with total investment 2.586 billion RMB. Daily capacity is 5000 ton/d, which is the largest in China, with 6x850t/d grate incinerator and this configuration is the first example in China. The Chimney height is 180m, the highest in China.
Basic design was completed on Jan, 2015; Detail engineering on Aug,2016; and Completion Acceptance on 28th March, 2019.
Project Awards:
First Prize of 2019 Excellent Engineering in Light Industry
Golden Prize of China 2017-2018 2nd batch Steel Structure Engineering 
            
 
    Dongguan Machong Waste Treatment Plant
                The project has 3 of 500 t/d incinerators,2×18MW condensation turbine generator unit with 1500t/d capacity, i.e annual 540,000t with occupied area 6.8 hectare and investment of CNY 760 million.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 258 million kWh and 200 million kWh on-grid. 
            
 
    Zhuhai Environmental Protection Biomass Thermal Power Project
                The project has 2 of 600 t/d incinerators,2×12MW condensation turbine + 2×15MW generator unit with 1200t/d capacity, i.e annual 430,000t with occupied area 5.54 hectare.
The expected annual power generation is 182.5 million kWh and 149.6 million kWh on-grid.
 
            
 
    Guangzhou No.4 Resource Thermal Power Plant
                The project has 3 of 750 t/d incinerators,2×25MW condensation turbine generator unit with 2000t/d capacity, i.e annual 720,000t with occupied area 9.43 hectare and investment of CNY 1.3 billion.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 250 million kWh and 210 million kWh on-grid. 
            
 
    Zhanjiang Domestic Waste Incineration Power Plant
                The EPC project has 3 of 500 t/d incinerators,2×25MW condensation turbine generator unit with 1500t/d capacity, i.e annual 540,000t with occupied area 9.43 hectare and investment of CNY 1.3 billion.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 160 million kWh and 130 million kWh on-grid. 
            
 
    Nanjing Jiangnan Jingmai Industry Park Waste Incineration Power Plant Project
                The project has 4 of 500 t/d incinerators,2×25MW condensation turbine generator unit with 2000t/d capacity, i.e annual 720,000t with occupied area 13.8 hectare and investment of CNY XXXX.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 352 million kWh and 296 million kWh on-grid. 
            
 
    Ningbo Beilun Domestic Waste Incineration Power Plant
                The project has daily capacity 1500t in two phases: 1000 t/d for 1st and 500t/d for 2nd with occupied area 5 hectare. In 1st phase there are 2 of 500t/d incinerator, 1×12MW condensation turbine generator unit with 700t/d capacity, i.e annual 233,000t and in the other phase and there is one 500t/d incinerator, 1×9MW condensation turbine generator unit with 700t/d capacity, i.e annual 165,000t. 
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
 
            
 
    Wujiang Domestic Waste Incineration Power Plant Project
                The project has 2 of 750 t/d incinerators,2×18MW condensation turbine generator unit with 1500t/d capacity, i.e annual 500,000t with occupied area 6 hectare.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
 
            
 
    Lanzhou Zhongpu Zi Domestic Waste Incineration Power Plant Project
                The project has daily capacity 3000t in two phases: 2000 t/d for 1st and 1000t/d for 2nd. In 1st phase there are 3 of 670t/d incinerator, 2×20MW condensation turbine generator unit with 2000t/d capacity, i.e annual 667,000t with occupied area 10 hectare. The phase 2 is reserved for construction. 
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
 
            
 
    Zhuhai Medical Waste Incineration Plant
The project is for medical waste treatment with total capacity of 10t/d in two phases, one of which has capacity of 5t/d.
 
    Hunan Li Ang Li County Biomass Power Plant
Construction period: Phase 1 from Aug, 2008 to Aug, 2009;Phase 2 from Dec, 2009 to July, 2010
	The project has 2 of 75t/h biomass boiler and 2 sets of 15MW condensation turbine generator unit with daily biomass consumption 940 t, i.e. annual 280,800 t. Total investment is CNY 240 million and occupied area is 13.33 hectare. The process set-up is two boilers and two generators. Bag dust remover is used for smoke clarification. In addition, circulating fluidized bed boiler is used as the key equipment to fulfill the combustion requirements of straw. 
The expected annual power generation is 195 million kWh and 171.6 million kWh on-grid.
 
    Rudong Municipal Solid Waste Incineration Power Plant
                Construction Location:Dong'an Technology Zone Rudong County 
Jiangsu Province, China
Area Covered:100 mu(66667 
sq.m)
Construction Scale:Waste Handling Capacity: 1000 t/d; 
365000 t/a
Equipments:Waste Incinerators: 2×250 t/d +1×500 
t/d grate incinerators
Steam Turbine-generators: 1×12 
MW+1×7.5 MW
Investment Scale:316.5 million 
yuan
Description:The plant adopted the foreign mature and 
advanced burning technology. And it is constructed by the national newest 
environmental protection standard.  
            
 
    Zhenjiang Municipal Solid Waste Incineration Power Plant
                Construction Location:Dianshang Village Xinqu Town Zhenjiang 
Jiangsu Province, China
Area Covered:206 mu(137667 
sq.m)
Construction Scale:Waste Handling Capacity: 1000 t/d; 
365000 t/a
Power Output (for sale): 100 million 
kWh/a
Equipments:Waste Incinerators: 3×350 t/d grate 
incinerators
Steam Turbine-generators: 2×12 
MW
Investment Scale:413 million 
yuan
Description:The plant adopted the foreign mature and 
advanced burning technology. The main emission standard of air pollutants 
consults DIRECTIVE 2000/76/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4 
December 2000 on the incineration of waste. 
            
 
    Wenling Waste Incineration Power Plant
                Construction Location:Wenling waste landfill site Zhejiang 
Province, China
Area Covered:28080 
sq.m
Construction Scale:Waste Handling Capacity: 700 t/d; 
255500 t/a
Equipments:Waste Incinerators: 2×350 t/d grate 
incinerators
Steam Turbine-generators:1×12 
MW
Investment Scale:270 million yuan 
            
 
    Datang Huayin Xiangtan Environmental Protection Power Plant
	Construction Location: Jianshe Village Shuangma Town Yuetang 
District Xiangtan Hunan Province, China
Construction 
Scale:Landfill Gas Handling Capacity: 800Nm3/h
Power 
Output: 957 kW
Equipments:Landfill Gas Handling 
Equipments: 1×800 Nm3/h
Torch Burning System: 30~500 
Nm3/h
Internal Combustion Generating Sets: 1×957 
kW
Investment Scale:18.03 million 
yuan
Description:This project was built in Shuangma Landfill 
Site. We designed and placed 19 shafts for bleeding the landfill gas. There is 
45 Nm3/h landfill gas per shaft.
 
    Biogas Power generation Project Of Jiangyin Municipal Solid Waste Incineration Power Plant Leachate Treatment Station
                Construction Location:Jiangyin Municipal Solid Waste 
Incineration Power Plant Jiangsu Province, China
Construction 
Scale:Landfill Gas Handling Capacity: 300 Nm3/h
Power 
Output: 360 kW
Equipments:Landfill Gas Handling 
Equipments: 1×300 Nm3/h
Internal Combustion Generating Sets: 2×180 kW
Investment Scale:2.6 million 
yuan
Description:This project was built in Jiangyin 
Municipal Solid Waste Incineration Power Plant. The raw material is biogas which 
is producted by waste leachate. 
            
 
    Jiangyin Municipal Solid Waste Incineration Power Plant
| 
					Construction Location:Qinhuang Village Yuecheng Town 
Jiangyin Jiangsu Province, China | 
 
    Zhenhai District Waste Incineration Power Plant, Ningbo City
	Construction Location:Ningbo Chemical Area Zhenhai district 
Ningbo Zhejiang Province, China
Area Covered:110 mu(73333 
sq.m)
Construction Scale:Waste Handling Capacity: 700 t/d; 
255500 t/a
Equipments:Waste Incinerators: 2×350 t/d grate 
incinerators
Steam Turbine-generators: 1×12 
MW
Investment Scale:270 million 
yuan
Description:This plant adopts the CFB incinerators 
designed by Chinese Academy Of Sciences. And it is constructed by the national 
newest environmental protection standard.
 
    Shenzhen Xiaping Landfill Site Biogas Power Plant
	Construction Location:Xiaping Landfill Site Shenzhen 
Guangdong Province, China
Construction Scale:Power Output: 
6000 kW
Equipments:Internal Combustion Generating Sets: 
1×1265 kW+1×500 kW+4×1064 kW 
Description:This plant was 
built in Xiaping Landfill Site and separated to 3 phases. The construction 
scales are 1×1265 kW+1×500 kW in phase 1,2×1064 kW in phase 2 and 2×1064 kW in 
phase 3. For now all the sets have run.
 
    Shanghai Laogang Solid Waste Landfill Site Biogas Power Project
                Construction Location:Laogang Solid Waste Landfill Site 
Shanghai City, China
Construction Scale:Landfill Gas 
Handling Capacity: 5100 Nm3/h
Power Output: 2500 
kW
Equipments:Landfill Gas Handling Equipments: 5100 
Nm3/h
Internal Combustion Generating Sets: 2×1250 kW  
            
 
    Mengniu Aoya Model Pastureland Biogas Power Plant and Synthetic Utilization Project
	Construction Location:Shengle Ecnomic Garden Helin County 
Huhhot Inner Mongolian Autonomous Region, China
Construction 
Scale:Power Output: 1260 kW
Equipments:Internal 
Combustion Generating Sets: 1×1260 kW
Investment Scale:45 
million yuan
Description:This project was built in Mengniu 
Aoya Model Pastureland. The raw material is biogas which is producted by cow 
dung. It is the first synthetic utilization project of animals’ dung of Chinese 
dairy industry. So it is considered possessing strong model value and economic 
utilization value.
 
    Dongguan Urban Area Waste Incineration Power Plant
	Construction Location:Shuilian Village Nancheng District 
Dongguan Guangdong Province, China
Area Covered:61706 
sq.m
Construction Scale:Waste Handling Capacity: 1200 t/d; 
438000 t/a
Equipments:Waste Incinerators: 3×400 t/d CFB 
incinerators
Steam Turbine-generators: 2×15 
MW
Investment Scale:320 million 
yuan
Description:This plant adopts the CFB incinerators 
designed by Chinese Academy Of Sciences. And it is constructed by the national 
newest environmental protection standard.
 
    Suzhou Qizishan Landfill Site Biogas Power Plant
                Construction Location:Qizishan Landfill Site Suzhou Jiangsu 
Province, China
Construction Scale:Landfill Gas Handling 
Capacity: 1600Nm3/h
Power Output: 2530 
kW
Equipments:Landfill Gas Handling Equipments: 2×800 
Nm3/h
Internal Combustion Generating Sets: 2×1365 
kW
Investment Scale:27.35 million 
yuan
Description:This project was built in Qizishan Landfill 
Site. 
            
 
    Nanhai Environmental Protection Power Plant
                Construction Location:Nanhai District Foshan Guangdong 
Province, China
Area Covered:65706 
sq.m
Construction Scale:Waste Handling Capacity: 400 t/d; 
146000 t/a
Equipments:Waste Incinerators: 2×200 t/d grate 
incinerators
Steam Turbine-generators:1×12 
MW
Investment Scale:200 million yuan 
            
 
    Zhuhai Waste Incineration Power Plant
                Construction Location:Qingsong Road Nanxi Qianshan Zhuhai 
Guangdong Province, China
Construction Scale:Waste Handling 
Capacity: 600 t/d; 219000 t/a
Equipments:Waste 
Incinerators: 3×200 t/d grate incinerators
Steam 
Turbine-generators:1×6 MW
Investment Scale:202 
million yuan
Description:This project was awarded the the 
first prize in 10th Excellent Project Design Competition of Light Industry, and 
the bronze medal in 10th Nation Excellent Design Competition. 
            
 
    Li'ang Lixian Biomass Power Plavt, Hunan Prov.
                Construction Location:Lixian Hunan Province, 
China
Area Covered:565 mu(377667 
sq.m)
Construction Scale:Biomass Handling Capacity: 150 t/d; 
365000 t/a
Equipments:Biomass Incinerators: 2×75 t/d CFB 
incinerators
Steam Turbine-generators: 2×15 
MW
Investment Scale:195 million 
yuan
Description:This plant was separated to 2 phases. The 
construction scales are 1×75 t/d CFB incinerator +1×15MW steam turbine-generator 
in phase 1, and the same in phase 2. For now the second phase project has been 
constructed. 
            
 
    Changzhou Municipal Solid Waste Incineration Power Plant
                Area Covered:75 mu(50000 sq.m)
Construction Scale:Waste Handling Capacity: 800 t/d; 292000 t/a
Power Output (for sale):77 million kWh/a
Equipments:Waste Incinerators: 2×400 t/d grate incinerators
Steam Turbine-generators: 1×12 MW
Investment Scale:412 million yuan
Description:The plant adopted the foreign mature and advanced burning technology. The main emission standard of air pollutants consults DIRECTIVE 2000/76/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4 December 2000 on the incineration of waste. The leachate processing was treated to the Grade-one A emission standard and re-cycled in the plant. The project was checked and accepted by Jiangsu Provincial Construction Department with 98 point mark, which is the highest point in Chinese incineration power plants. 
            
 
    Jining Household Waste Incineration Power Plant
                Capacity: about 190 million kW/h; 
Power output(for sale): about 160 million kW/h;
Equipment: CFB waste incinerator:3×500t/day;
Steam turbine generator:2×15 MW; urban household waste and coal used as mixture fuel; the ratio of household waste and coal 9:1~95:5; two sets of fuel supply systems. 
 
            
 
    Suqian Household Waste Incineration Power Plant
                Equipment: Mechanical grate type waste incinerator:2×300t/day; steam turbine generator:1×12 MW 
1.An integrated set of mechanical grate type waste incinerator and HRSG, adopt layer combustion technology, the most popular and has the greatest handling capacity around the world. 
2.The flue gas treatment process:semi-dry lime ( rotating spray ) + Activated Carbon + baghouse. 
3.Turbine generator: medium pressure, single cylinder EC turbine generator. 
4. Main steam system: centralized master control system. 
 
            
 
    Honghu Li'ang Bio-power Plant
                Total area: 130 mu; 
Construction scale: biomass handling capacity 533 t/day, 144,300 t/year;
Investment scale: 133 million RMB;
Equipment: one 90t/h biomass boiler and one 20MW steam turbine generator;
Baghouse for flue gas treatment and CFB technology for waste incineration. 
 
            
 
    Eastern Suburb Kunming Municipal Solid Waste Incineration Power Plant
                Construction Location:Kunming City Yunnan Province, China 
Area Covered:100470 sq.m
Construction Scale:Waste Handling Capacity: 1600 t/d; 584000 t/a
Power Output (for sale): 200 million kWh/a
Equipments:Waste Incinerators: 4×400 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×15 MW
Investment Scale:450 million yuan
Description:This plant adopts the CFB incineration patented technology developed by Zhejiang University. And it is constructed by the national newest environmental protection standard.
 
            
 
    Anqing Municipal Solid Waste Incineration Power Plant
                Construction Location:Xijiaoshankou Xiang Anqing City Anhui Province, China 
Area Covered:69713 sq.m
Construction Scale:Waste Handling Capacity: 1000 t/d; 365000 t/a
Equipments:Waste Incinerators: 2×500 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×12 MW
Investment Scale:280 million yuan
Description:This plant adopts the CFB incinerators designed by Chinese Academy Of Sciences. And it is constructed by the national newest environmental protection standard.
 
            
 
    Changde Municipal Solid Waste Incineration Power Plant
                Construction Location:Hejiaping Village Deshan Development Zone Changde City Hunan Province, China 
Area Covered:100 mu(67777 sq.m) 
Construction Scale:Waste Handling Capacity: 800 t/d; 292000 t/a
Power Output: 99.2 million kWh/a
Equipments:Waste Incinerators: 2×500 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×12 MW
Investment Scale:280 million yuan
Description:This plant adopts the CFB incinerators designed by Chinese Academy Of Sciences. And it is constructed by the national newest environmental protection standard.
 
            
 
    
 
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                    